Focus on-Project Cargo door to door services

For  example:

  300MT steel pipe from Nanjing to Dammam

1.clip_image002.jpgclip_image001.gifclip_image002.jpgblob.pngblob.pngclip_image001.gifclip_image009.jpgclip_image001.gifclip_image002.jpg


2.blob.png clip_image001.gif blob.png  SHANGHAI:7USD             


3.blob.png clip_image001.gifblob.pngSHANG HAI--DAMMAM: 40USD/W/M  FLT

 

 TOTAL:(1+2+3)+(1+2+3)*6%(tax)=(27.78+7+40)+(27.78+7+40)*6%(tax)

                          =74.78+44.87

                          =119.65USD/MT

 

NANJING--DAMMAM: 119.65*300=35895USD

 



 150MT steel pipe from Qin Huangdao to Houston(Length:10 m,Width:3.2 m.height: 2.8m)




1.clip_image002.jpgclip_image001.gifblob.pngblob.pngclip_image002.jpgclip_image001.gifclip_image009.jpgclip_image001.gifclip_image004.jpg

   

 clip_image004.jpg


2.blob.png clip_image001.gifblob.png TIAN JIN:7USD


blob.png

3.blob.png clip_image001.gifblob.png TIAN JIN--Houston:400USD/W/M  FLT


   

TOTAL:(1+2*150+3*150)+(1+2*150+3*150)*6%(tax)=(9416.67+7*150+400*150)+(9416.67+7*150+400*150)*6%(tax)

                          =70466.67+4228

                          =74694.67USD


  Huangdao to Houston:74694.67USD